Employee Tracking Software & App
Location tracking that eliminates doubt
Real-time Location Monitoring
95% Accurate Distance Calculation
Create Geofence Alerts
No Credit Card Required
Make every minute count with Live Location Tracking
Monitor Real-time Employee Location
With unparalleled accuracy and reliability, you can monitor the location and movement of your field team.
Increase Accountability with Geofences
Get real-time geofence boundary notifications when a team member enters or exits a geofence.
Track total distance travelled
Know how much they have travelled with 95% accuracy with our proprietary distance calculation algorithm
Detailed Timeline Review
Review the timeline of your field team members to know where they have been and what they have been doing.
Want to monitor your team's real time location?
Unolo makes it easy for you to know where they are.
Attendance
Employee punches in to start their day.
Tracking
Unolo starts tracking their location.
Monitoring
You can monitor real-time & historical location on the panel.
Distance Calculation & Conveyance Claims can be a hassle.
But not when you have Unolo.
Keep track of your field executives total distance travelled with our GPS based distance calculation feature.
Verify the accuracy of claimed distances by comparing them with actual distance travelled.
Unolo can also capture odometer readings and turn them into conveyance claims automatically, saving you both time and resources with high-precision tracking.
Want to know if they are going somewhere outside their assigned area?
Get notified when they enter and exit their geofence.
Create geofences
Define regions to monitor - something as simple as an office or as complex as a forest
Sit back and let Unolo do the work
Unolo will automatically send notifications when they enter or exit that geofence.
We make sure that location tracking is reliable and accurate.
GPS Spoofer Detection
Get notified when a GPS spoofer is detected.
Date/Time manipulation
App stops working if it detects date or time are changed.
GPS On/Off Notifications
Get instant notification if GPS is disabled on any device.
Works in Zero Connectivity
As long as GPS is turned on, Unolo can monitor your team's location.
95% Accurate Tracking
Track real-time location of your field teams with 95% accuracy.
Video Setup Guides
Watch video setup guides for each model and make.
Intuitive dashboards
Unolo's intuitive dashboard puts you in the driver's seat, providing complete control over your business operations.
- Stay up-to-date on attendance track who's present and who's on leave.
- Monitor the real-time location of all your field employees.
- Stay informed about your staffing levels at each business location.
- Check historical data and download comprehensive reports.
Bad or No Internet? Unolo Works Everywhere
Don't let a lack of internet connectivity hamper your plans of expanding your business.
Our cutting-edge technology automatically syncs data when the connection is restored, ensuring your operations run smoothly at all times.
If you're looking for a field employee tracking app that is dependable, look no further and click on the button below.
